What is your method of drawing plumbing, sewage and central heating installations?
The last underfloor heating project I made is attached. However, it took me 1.5 hours.
The effect is satisfactory for me, but unfortunately connecting each line at a 90° angle and precisely moving the lines together was time-consuming. A nice feature would also be the ability to draw all installations from the wall view, not only from the room view, to be able to send the investor a report with the route of pipes and cables, their diameter and spacing.
I wonder how you deal with drawing tubes? :)
I will be grateful for all suggestions :)